Doncaster Inland Port Enabling Works

Doncaster Inland Port Enabling Works

Our customer has secured planning permission to construct “ iPort” which comprises of a 337 acre (net developable) greenfield development site in Doncaster with an outline planning consent for up to 6 million sq ft of warehouse space and 3 million sq ft of detailed planning consent.

Read the full case study

our case study archive

M5 Gloucester Gateway Motorway services

M5 Gloucester Gateway Motorway services

Harlaxton Engineering Services were appointed to design and install a 1.4km pipeline to supply gas & water as well as an onsite electrical 11,000v HV supply to phase 2 of the M5 Gloucester Gateway Motorway services.

Lincolnshire Gateway

Lincolnshire Gateway

Harlaxton Engineering Services were appointed to design and install a 1.4km pipeline to supply gas & water as well as an onsite electrical 11,000v HV supply to phase1 of the Lincolnshire Gateway Project.